NEMA environmental audit in Nairobi

An environmental impact assessment comes before a project; an environmental audit comes after. It checks a running project or premises — a building, a factory, a hospital, a fuel station — against its licence conditions and the law, and sets out what to put right. A NEMA-registered expert carries it out, and ENVIS files it by the project’s risk.

Check the site on the map Apply on ENVIS (NEMA)

When you need it

Who prepares it and applies

A NEMA-registered environmental audit expert carries out the audit for the owner or operator, and submits the report on ENVIS. Applications are made online on ENVIS, NEMA’s licensing system.

Check the site before you apply

Most of what a NEMA report describes is already on the map. Check these first:

CheckWhereWhy it matters
The plot and its numberSearch the map by LR, block or FR numberEvery report and licence names the plot. Make sure the parcel on the map is the land the project is on.
Whether the site already has a licenceThe NEMA layers on the map, then the seller’s papersA licence on the site carries its number, its holder and its conditions. Buying the project means transferring it.
Where wastewater goesThe Trunk sewer layer, and connecting to the sewerInto a public sewer, it is agreed with the water company. Anywhere else, it needs NEMA’s effluent discharge licence.
Rivers, wetlands and riparian landThe rivers and water bodies layers on the mapWork near a river or a wetland raises a project’s effects, and can need separate consent from NEMA and the Water Resources Authority.
Who lives around itThe census population layers on the mapThe expert must consult the people a project affects; the census says how many live around it.
The right to the landAn official search on ArdhisasaThe proponent must own the land or have the owner’s consent. Reports usually include a copy of the title.

How the application moves

  1. Gather the papers. The expert collects the licences, their conditions and the records the project has kept: waste, effluent, emissions, noise, safety.
  2. Visit and measure. An inspection of the site, interviews with the people who run it, and measurements where they are needed.
  3. Report. What meets the licence and the law, what does not, and a plan to put it right, with dates.
  4. Submit on ENVIS. The audit report is lodged online and its fee paid.
  5. NEMA follows up. NEMA reviews the report, may inspect the site, and may order the corrective actions.

How long it takes

An audit takes as long as the site and its records need, and NEMA then reviews the report. Keeping good records through the year is what makes it quick. Follow it on ENVIS.

After the licence

Carry out the corrective actions the audit sets, and keep the records: the next audit, or a NEMA inspection, starts from them.

On the map: the NEMA layers

Environmental audit records are in the map’s Audits layer, one of three NEMA layers. Each record carries its licence and application numbers, the proponent it was issued to, the kind of licence, and the plot or LR number where the report gave one. It sits where NEMA’s licensing system drew the site — a point, a boundary or a line. A record whose report states a position far from that site is flagged, as a prompt to confirm the plot. Applications with no drawn site are not on the map.

The NEMA layers are add-on layers: each is bought once, on any plan, and kept — see plans and pricing.

Why start on Nairobi Maps

Every NEMA report starts from the site: where it is, what may be built there, and what is around it. Nairobi Maps holds those facts for every parcel in Nairobi on one map — the plot by its LR, block or FR number, its zone worked out for the plot, survey plans, rivers and roads, airport height limits, census population, and what NEMA has already licensed nearby. The owner, the architect and the expert start from the same facts. The whole checklist is in built-environment due diligence in Nairobi.

Questions

How long does a NEMA environmental audit take?

An audit takes as long as the site and its records need, and NEMA then reviews the report. Keeping good records through the year is what makes it quick. Follow it on ENVIS.

What is the difference between an EIA and an environmental audit?

An EIA looks ahead, before a project starts, at the effects it could have. An audit looks at a project that is already running, against its licence and the law.

How often is an environmental audit done?

It depends on the project and its licence conditions — commonly once a year for a running project. NEMA can also carry out its own control audit at any time.

Is Nairobi Maps part of NEMA?

No. Nairobi Maps is an independent map of Nairobi’s land, its planning rules and the records around them, for checking a site before you apply. NEMA decides every licence, on ENVIS.

Nairobi Maps is not part of NEMA. This guide explains the usual route under EMCA and NEMA’s regulations; requirements, fees and steps change, so confirm them with NEMA on ENVIS and with a registered expert.